When a glass panel, approximately 2800 by 2300mm in 22mm thick tempered safety laminate broke, at the entrance to the lift giving access to the new Cross Rail Link and a visit by a VIP was imminent, Express Glazing Contractors were called.

Work included survey, manufacture, risk assessment, method statement, liason and attendance of lift engineers, specialist lifting equipment, accelerated glass manufacturer, road closure and night work by Express Glazings Contractors experienced glaziers who completed the work successfully minutes ahead of the visit. 